SEDIMENTATION PLANT

3P HYDROSHARK GULLY

Full flow treatment without separating element.

Areas up to 500 m².

Volume flows up to 12.5 l/s Combination structures unlimited.

PLANNING CERTAINTY THROUGH APPROVALS

DESIGN ACCORDING TO
DWA-A102

DESIGN ACCORDING TO
DWA-M153

TESTED IN ACCORDANCE WITH
TRENNERLASS NRW

LANUV-
LIST NRW

MEASUREMENT TOOL

FOR THE TREATMENT OF RAINWATER FOR YOUR PROPERTY IN ACCORDANCE WITH DWA-A 102/BWK-A 3-2

Determination of the appropriate treatment plant for discharge into surface waters.

TENDER SPECIFICATIONS &
DRAWINGS

Request your
tender texts and
drawings!

PLANNING TOOLS

Individual, needs-oriented &
up-to-date information

BIM DATA

Building information modeling
(Building Information Modelling, BIM) for
the provision of 3D and 2D data,
tender texts and other
information for your construction projects.

YOU NEED PROFESSIONAL
SUPPORT OR
HAVE QUESTIONS FOR US?

Jonas Bitterling, M. Eng.
Project Engineer

Tel +49 (0) 7334 92460-12
Mail bitterling@3ptechnik.de

Daniel Betschner,
Master Professional of
Technical Management (CCI)
Project Engineer

Tel +49 (0) 7334 92460-32
Mail betschner@3ptechnik.de

REFERENZEN

3P TECHNIK BAD ÜBERKINGEN 

INDUSTRIAL BUILDING 

FUNKTIONSPRINZIP

The water flows tangentially into the center of the hydrodynamic separator.

Solids settle to the bottom, floating matter remains on the water surface.

The solids are collected in the sludge trap, which is hydraulically separated from the treatment chamber by flow breakers and a grating to prevent remobilization.

The water rises evenly up the side walls.

The purified water is collected in an annular chamber via a serrated weir and then transported to the outlet.

The water runs off.

THE HYDROSHARK GULLY

HIGH CLEANING PERFORMANCE AS ROAD INLET

With its unique functionality, the 3P Hydroshark gully combines the cleaning efficiency of a larger system with the decentralized concept of stormwater treatment.

It can be used to clean the rainwater from roads and squares of coarse matter, sediment, light materials and particulate load in a standard DN 800 manhole in a very small space, so that it can be discharged into the watercourse or even infiltrated, depending on the local conditions. Rescheduling is not necessary, as with its connectable area of 500 m² and its suitability as a head inlet or for a lateral connection, it replaces the “normal” drains 1:1 as a decentralized treatment system.

It therefore combines simple planning and design with simple installation and maximum ease of maintenance, as only a standard suction hose and trolley are required.

There is no need to empty sludge buckets, as these are no longer required with this system.

APPLICATION AREAS

Traffic areas

Roof surfaces

Special applications

Connectable area: Up to 500 m².

Connections: DN 150 – 200.

Inlet as head inlet.

Minimal loss of height.

Simple maintenance with standard maintenance equipment.