SEDIMENTATION PLANT
3P HYDROSHARK GULLY
Full flow treatment without separating element.
Areas up to 500 m².
Volume flows up to 12.5 l/s Combination structures unlimited.
PLANNING CERTAINTY THROUGH APPROVALS
DESIGN ACCORDING TO
DWA-A102
DESIGN ACCORDING TO
DWA-M153
TESTED IN ACCORDANCE WITH
TRENNERLASS NRW
LANUV-
LIST NRW
MEASUREMENT TOOL
FOR THE TREATMENT OF RAINWATER FOR YOUR PROPERTY IN ACCORDANCE WITH DWA-A 102/BWK-A 3-2
Determination of the appropriate treatment plant for discharge into surface waters.
TENDER SPECIFICATIONS &
DRAWINGS
Request your
tender texts and
drawings!
PLANNING TOOLS
Individual, needs-oriented &
up-to-date information
BIM DATA
Building information modeling
(Building Information Modelling, BIM) for
the provision of 3D and 2D data,
tender texts and other
information for your construction projects.
YOU NEED PROFESSIONAL
SUPPORT OR
HAVE QUESTIONS FOR US?
Jonas Bitterling, M. Eng.
Project Engineer
Tel +49 (0) 7334 92460-12
Mail bitterling@3ptechnik.de
Daniel Betschner,
Master Professional of
Technical Management (CCI)
Project Engineer
Tel +49 (0) 7334 92460-32
Mail betschner@3ptechnik.de
REFERENZEN
3P TECHNIK BAD ÜBERKINGEN
INDUSTRIAL BUILDING
FUNKTIONSPRINZIP
①
The water flows tangentially into the center of the hydrodynamic separator.
②
Solids settle to the bottom, floating matter remains on the water surface.
③
The solids are collected in the sludge trap, which is hydraulically separated from the treatment chamber by flow breakers and a grating to prevent remobilization.
④
The water rises evenly up the side walls.
⑤
The purified water is collected in an annular chamber via a serrated weir and then transported to the outlet.
⑥
The water runs off.
THE HYDROSHARK GULLY
HIGH CLEANING PERFORMANCE AS ROAD INLET
With its unique functionality, the 3P Hydroshark gully combines the cleaning efficiency of a larger system with the decentralized concept of stormwater treatment.
It can be used to clean the rainwater from roads and squares of coarse matter, sediment, light materials and particulate load in a standard DN 800 manhole in a very small space, so that it can be discharged into the watercourse or even infiltrated, depending on the local conditions. Rescheduling is not necessary, as with its connectable area of 500 m² and its suitability as a head inlet or for a lateral connection, it replaces the “normal” drains 1:1 as a decentralized treatment system.
It therefore combines simple planning and design with simple installation and maximum ease of maintenance, as only a standard suction hose and trolley are required.
There is no need to empty sludge buckets, as these are no longer required with this system.
APPLICATION AREAS
Traffic areas
Roof surfaces
Special applications
Connectable area: Up to 500 m².
Connections: DN 150 – 200.
Inlet as head inlet.
Minimal loss of height.
Simple maintenance with standard maintenance equipment.